Gump Posted December 3, 2012 Report Share Posted December 3, 2012 Any concrete guys here? I was repairing some crumbling or cracked concrete and ran out of material. It's a small area and the vinyl patch is in the area but I didn't have enough to bring it to the correct level so how long should I wait before putting more vinyl concrete on top of it? It's an indoor slab. The area is maybe 1.5' x 2.5'. Depth of what is in there varies 1-2 inch and I roughed it up so they new would adhere. What's left to fill is maybe 1" in depth. Quote Link to comment Share on other sites More sharing options...
shadyone Posted December 4, 2012 Report Share Posted December 4, 2012 I'd say wait the 24 hours for foot traffic cure and rescuff and reapply. Never really used it it that's pretty typical for repair. Quote Link to comment Share on other sites More sharing options...
Gump Posted December 4, 2012 Author Report Share Posted December 4, 2012 Thanks Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.