So my run of bad luck with contractors continues. I recently hired a company, to pour me a 10'x12' concrete pad to build a shed on. The shed manufacture called for a 121" x 143 1/4" I told the mason this, and he replied 10'x12' sounds good to him, lol. I figured the 1" one was being short and 3/4" the other way being long wouldn't make to much of a difference Anyway this guy ends up measuring his forms from outside to inside of 2x4". Making the pad 1 1/2" short on both sides.
Mason's remedy is to add 4" more to 2 sides. Will this work or just asking for trouble down the road. I think I should just let shed hang over pad, and ask for discount. Please give any advise.