mrtbolt64 Posted March 27, 2011 Report Share Posted March 27, 2011 93 YZ250, picked up from a member here as a project bike and lost interest. Front forks were rebuilt, new brakes and bearings. New Plastic. Jug was fitted with cast sleeve and standard bore Weisco piston installed. New Clutch pack installed. New FMF pipe and silencer. There is new front and rear sprockets and new chain. Rear swing arm rebuild kit and shock rebuild kit. These parts were not installed. Bike runs but now needs carb cleaned from sitting and needs gasket for clutch case. I had over 1000 in just new parts. 850.00 http://i1113.photobucket.com/albums/k503/mrtbolt64/100_1166.jpg http://i1113.photobucket.com/albums/k503/mrtbolt64/100_1165.jpg http://i1113.photobucket.com/albums/k503/mrtbolt64/100_1155.jpg Link to comment Share on other sites More sharing options...
mrtbolt64 Posted April 3, 2011 Author Report Share Posted April 3, 2011 bump..........anyone need a bike for summer? Link to comment Share on other sites More sharing options...
Recommended Posts