Twistedrx7 Posted May 21, 2013 Report Share Posted May 21, 2013 old thread was closed http://www.columbusracing.com/forums/showthread.php?t=101899&page=2 so i have done a lot so far. counter tops in the kitchen. Downdraft and stove top installed. http://i27.photobucket.com/albums/c168/twistedrx7/0317032152b_zps0bb14d59.jpg Put in disposal, had to reroute the plumbing to the other side. http://i27.photobucket.com/albums/c168/twistedrx7/0317032152a_zps0ae6c1ed.jpg New siding, gutters, downspouts all around. (ended up getting 5 windows replaced due to the company breaking them when taking out old siding. http://i27.photobucket.com/albums/c168/twistedrx7/house/CIMG5051_zps344e277b.jpg new carpet in whole house http://i27.photobucket.com/albums/c168/twistedrx7/Mobile%20Uploads/downsized_0516032233_zps48db38df.jpg http://i27.photobucket.com/albums/c168/twistedrx7/Mobile%20Uploads/0516032235a_zpsc4d7d5b6.jpg counter tops in laundry room are going in Thursday pictures to come along with the jetted laundry sink, and back splash. Quote Link to comment Share on other sites More sharing options...
smokin5s Posted May 21, 2013 Report Share Posted May 21, 2013 very nice! Quote Link to comment Share on other sites More sharing options...
Twistedrx7 Posted May 26, 2013 Author Report Share Posted May 26, 2013 Countertops installed only took about an hour to cut out and put in. http://i27.photobucket.com/albums/c168/twistedrx7/603540_10151500278863043_1090690402_n_zpsaadd7e73.jpg http://i27.photobucket.com/albums/c168/twistedrx7/IMG_0012_zps5896d2f1.jpg http://i27.photobucket.com/albums/c168/twistedrx7/IMG_0015_zps31cf09c1.jpg Then decided it was time to tile.Not bad for a couple of hours. Just need to finish up the small cuts and grout. Kitchen will be a breeze now. http://i27.photobucket.com/albums/c168/twistedrx7/970819_10151503776553043_749832152_n_zps60209c7f.jpg Quote Link to comment Share on other sites More sharing options...
Twistedrx7 Posted June 2, 2013 Author Report Share Posted June 2, 2013 APCO the siding company came out and placed the critter guards on the vents finally. however, they ended up containing a bird inside the vents. I didnt find out until the next day. Luckily the bird was still alive and i was able to cut the guard off and free it. Looks like they will have to come back out and take off the siding and cent guard to fix that. Levi4floors was finally able to make it out to restretch the carpet and fix the seams after 3 weeks. Now they just need to fix the seam in the master and replace a strip of carpet. However, the carpet installer (since Levi sub contracts) said he wouldnt come back out to the he was done here and walked off the job. This was done without any provoking or me saying anything to him. More to come. Quote Link to comment Share on other sites More sharing options...
SRTurbo04 Posted June 2, 2013 Report Share Posted June 2, 2013 Dude do you ever have any one that does work to the house that is done right the first time and not need fixed or they break something lol? Quote Link to comment Share on other sites More sharing options...
Twistedrx7 Posted June 2, 2013 Author Report Share Posted June 2, 2013 Dude do you ever have any one that does work to the house that is done right the first time and not need fixed or they break something lol? haha, educated homeowner is the worst kind. Sometimes it just takes some common sense for the company doing the work, the devil is in the details. I always let them know my expectations up front. I would however recommend Konkus Marble and Granite. Very professional, timely and great install of the counter tops thus far Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.