Jump to content

Project House continued again


Twistedrx7
 Share

Recommended Posts

old thread was closed

 

http://www.columbusracing.com/forums/showthread.php?t=101899&page=2

 

so i have done a lot so far.

 

counter tops in the kitchen. Downdraft and stove top installed.

 

http://i27.photobucket.com/albums/c168/twistedrx7/0317032152b_zps0bb14d59.jpg

 

Put in disposal, had to reroute the plumbing to the other side.

 

http://i27.photobucket.com/albums/c168/twistedrx7/0317032152a_zps0ae6c1ed.jpg

 

 

New siding, gutters, downspouts all around. (ended up getting 5 windows replaced due to the company breaking them when taking out old siding.

 

http://i27.photobucket.com/albums/c168/twistedrx7/house/CIMG5051_zps344e277b.jpg

 

new carpet in whole house

 

http://i27.photobucket.com/albums/c168/twistedrx7/Mobile%20Uploads/downsized_0516032233_zps48db38df.jpg

 

http://i27.photobucket.com/albums/c168/twistedrx7/Mobile%20Uploads/0516032235a_zpsc4d7d5b6.jpg

 

counter tops in laundry room are going in Thursday pictures to come along with the jetted laundry sink, and back splash.

Link to comment
Share on other sites

Countertops installed only took about an hour to cut out and put in.

 

http://i27.photobucket.com/albums/c168/twistedrx7/603540_10151500278863043_1090690402_n_zpsaadd7e73.jpg

http://i27.photobucket.com/albums/c168/twistedrx7/IMG_0012_zps5896d2f1.jpg

http://i27.photobucket.com/albums/c168/twistedrx7/IMG_0015_zps31cf09c1.jpg

 

Then decided it was time to tile.Not bad for a couple of hours. Just need to finish up the small cuts and grout. Kitchen will be a breeze now.

 

http://i27.photobucket.com/albums/c168/twistedrx7/970819_10151503776553043_749832152_n_zps60209c7f.jpg

Link to comment
Share on other sites

APCO the siding company came out and placed the critter guards on the vents finally. however, they ended up containing a bird inside the vents. I didnt find out until the next day. Luckily the bird was still alive and i was able to cut the guard off and free it.

 

Looks like they will have to come back out and take off the siding and cent guard to fix that.

 

Levi4floors was finally able to make it out to restretch the carpet and fix the seams after 3 weeks. Now they just need to fix the seam in the master and replace a strip of carpet. However, the carpet installer (since Levi sub contracts) said he wouldnt come back out to the he was done here and walked off the job. This was done without any provoking or me saying anything to him.

 

More to come.

Link to comment
Share on other sites

Dude do you ever have any one that does work to the house that is done right the first time and not need fixed or they break something lol?

 

haha, educated homeowner is the worst kind. Sometimes it just takes some common sense for the company doing the work, the devil is in the details. I always let them know my expectations up front.

 

I would however recommend Konkus Marble and Granite. Very professional, timely and great install of the counter tops thus far

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...