The remodel is coming along. Slowly but surely. The PM we had from Roth construction was shit canned along with our "interior designer" and the main subcontractor building the house. Now I got a new guy and he seems to be getting shit done.
The furnace and water tank have been moved downstairs (we wanted that), all the framing work has been redone. They had to completely rebuild the addition as it wasn't even close to being up to code (previous owner cut so many corners). Siding, windows and gutters have been installed except they put the wrong front window in and the basement windows haven't been installed. The replacement front window and the two basement windows are at the house now and will be installed tomorrow. Plumbing is done.
Anyways. here's a picture dump.
Bathroom remodel complete
IMG_20191212_102041 by Shawn Bucklad, on Flickr
This was behind the tub surround. Neat.