Last weekend was perfect for riding. Unfortunately, it was also perfect for getting some outside work done around the house. With that said, I was able to get out for a short ride. The ST1100 has turned over 100,000 miles. Once the majority of the riding season is over, I need to replace the timing belt and send by Alpinestar boots to get new soles. Historically, my bike gets put up around mid-December until early February - barring days with clear roads and high temperatures above freezing. Riding to work and home in the dark with temps below freezing is not especially fun. Riding on snow- and ice-covered roads is a non-starter for me - unless I get caught in it. Nothing like slick surfaces to ensure precise throttle, brake and steering inputs. When do you typically put your bike up?