Jump to content

Winter build


Total Sign
 Share

Recommended Posts

New water pick up

http://img.photobucket.com/albums/v177/Hyperbaja/rear12011.jpg

 

The "before" pic of the bilge, lots to change.

http://img.photobucket.com/albums/v177/Hyperbaja/bilge2011.jpg

 

GPS Speedo and reciever

http://img.photobucket.com/albums/v177/Hyperbaja/speedo.jpg

 

http://img.photobucket.com/albums/v177/Hyperbaja/gpsantenna.jpg

 

Sea strainer

http://img.photobucket.com/albums/v177/Hyperbaja/strainer.jpg

 

 

And making good use of the white crap

http://img.photobucket.com/albums/v177/Hyperbaja/cooler.jpg

Link to comment
Share on other sites

  • 3 months later...

Trying to have it ready to be sent down 6/8, fly down 6/9 for Jacksonville. Not sure how it will pan out. Powder coated the new throttle and shifter, have to build a pod and order new cables, it'll be a stock motor, raised X and stand off box for that run, blower and shorty coming after, I hate time!

 

In the oven:

http://img.photobucket.com/albums/v177/Hyperbaja/throttles1.jpg

 

After getting the treatment:

The throttle has a red plug in with trim switch that fills the hole in the center.

http://img.photobucket.com/albums/v177/Hyperbaja/throttlehandles.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...