Jump to content

Boat Project


Linn1647545492

Recommended Posts

  • Replies 169
  • Created
  • Last Reply

Top Posters In This Topic

  • 3 weeks later...
  • 2 weeks later...
Memorial weekends come up, this boat going to be cocked locked and ready to rock?

 

 

I'm shooting for a July 4th deadline at the latest. I've been playing the waiting games on parts this entire time and still waiting on a few other things. Now just waiting on ProCharger.

 

I did make some progress over the last few weeks.

http://i165.photobucket.com/albums/u57/playwithlinn/57CAE145-F7C5-4908-A198-5A22EC190E02_zpsgmvie0qz.jpg

 

New HP500 coupler finally showed up

http://i165.photobucket.com/albums/u57/playwithlinn/B96A7BAA-929E-4BEF-ABD1-01C6C4685624_zps78xoteoj.jpg

Link to comment
Share on other sites

  • 2 weeks later...

Finished all the MSD wiring, fuel system is in and wired, relocated the oil filter, powder coated the custom bracket. Finished and powder coated the intercooler bracket only to find out the intercooler bleeds off pressure and I need to order a new one.

 

Still on my to do list:

Rewire Mercathod

Strip and powder coat headers (Still waiting on John Moore to finish the second)

Powder coat both intercooler pipes

Pickup 3 inch coupler

Change/Add fluids

Mount and plum catch can

Install wide band and boost gauge

relocate hatch actuator

Run intercooler exit lines

Install outdrive

 

I feel like it's a never ending list.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...